Infrastructures for land mobility

REFERENces - Project Verification

Infrastructures for land mobility

New railway connection of the Turin – Lyon high-speed line: PD2 Italian section and PR French section

CLIENT: Private Company
SERVICE PERFORMED: Verification of the final design
TOTAL WORKS AMOUNT: Euro 8 billion (ICK agent 70%)

Modernization and adaptation to type 1 / a of the CNR / 80 standards of the A3 Salerno-Reggio Calabria motorway

CLIENT: Private Company
SERVICE PERFORMED: Verification of the executive design
TOTAL WORKS AMOUNT: Euro 420 million (100% ICK)

Construction of the Brienza variant – 6th Lot I and II extract – “Tito-Brienza variant” (Total works amount: Euro 100 million).

S.S. adaptation works 534 as a motorway link between the A3 motorway (Firmo junction) and the S.S. 106 Jonica (Sibari interchange) – MEGALOTTO 4 (Total works amount: Euro 120 million).

Connection system (People Mover) between the airport and the Pisa Centrale railway station, parking exchangers and connection routes (Total works amount: Euro 43 million).

In the last five years, Inarcheck has carried out infrastructural verification services for land mobility for an amount of works of approximately 9.5 billion euros

Other references